The disagreement layer

Where the official sources disagree

Two official documents, both in effect, giving different answers — with each one cited and neither adopted. Generated from the engine, not written by hand.

39 source documents on fileoldest revision 1995-09-01last retrieved 2026-09-0521 live conflicts15 named gapsFree · no account needed

The short version: across 31 covered states there are 21 fields where two in-effect official documents give different answers, and 15 ranges that no published schedule prices at all. Neither side of a disagreement is adopted: the engine returns no value and the permit goes to the issuing agency. Every entry below names both documents and the pinpoint cite in each, so the question to the permit office is "which of these two do you charge" rather than "how much is it".

The disagreements

21 places two official documents disagree

Each entry below is a field where two documents that are both in effect, both official and both published by the state give different answers. We hold both and adopt neither. Finding one of these required reading both documents, which is why they are not in anybody else's table.

Florida — legal semitrailer length

57'6" Fla. Admin. Code r. 14-26.008 — Schedule of Fees (FDOT copy) — Florida Department of Transportation — Table 1A overdimension fees; Table 1B overweight fees; the $3.33 administrative cost and the 25-mile worked example; "(3) SPECIAL PERMIT FEES Transmission Fee $5.00"
rev. 2018-04-24 · read 2026-09-02
57' Fla. Stat. §316.515 — Maximum width, height, length — The Florida Senate, 2024 Florida Statutes — width 102 in (96 in on roads without a 12 ft through lane); height 13 ft 6 in (14 ft for automobile transporters); semitrailer 48 ft, or up to 57 ft with a kingpin-to-rear-axle distance not over 41 ft; front overhang 3 ft; last amended s. 2, ch. 2019-149
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Florida — legal tandem-axle weight

40,000 lb Fla. Stat. §316.535 — Maximum weights — The Florida Senate, 2024 Florida Statutes — single axle 20,000 lb; W = 500((LN ÷ (N–1)) + 12N + 36) and 80,000 lb gross "including all enforcement tolerances"; subsection (3) axle-spacing table; last amended s. 6, ch. 2002-20
undated document · read 2026-09-02
34,000 lb Fla. Stat. §316.535 — Maximum weights — The Florida Senate, 2024 Florida Statutes — single axle 20,000 lb; W = 500((LN ÷ (N–1)) + 12N + 36) and 80,000 lb gross "including all enforcement tolerances"; subsection (3) axle-spacing table; last amended s. 6, ch. 2002-20
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Georgia — legal single-axle weight

20,340 lb Georgia DPS/MCCD — Oversize Permit Laws (undated) — Georgia Department of Public Safety, Motor Carrier Compliance Division — width 8'6"; height 13'6"; length 100 ft including overhang; 53 ft standard trailer; 80,000 lb gross; "Legal axle weight is 20,340 pounds."; federal bridge formula
undated document · read 2026-09-02
20,000 lb Georgia — Pilot/Escort Student Workbook (PDF, undated) — Georgia Department of Public Safety, Motor Carrier Compliance Division — height-pole specification; four-year certificate validity; "Weight is greater than 80,000 lbs. (20,000 lbs. single axle, 34,000 lbs. tandem axle)"; the two-escort reading above 16 ft; the "in excess of 15'6"" and "15' or greater in larger cities" height-sensor readings
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Georgia — legal tandem-axle weight

34,000 lb Georgia DPS/MCCD — Selected statutes, O.C.G.A. Title 32 extract (PDF) — Georgia Department of Public Safety, Motor Carrier Compliance Division — tandem 40,680 lb on non-national highways; 34,000 lb on national highways; the under-73,280 lb / not-over-55 ft exception
rev. 2011-07-01 · read 2026-09-02
40,680 lb Georgia DPS/MCCD — Oversize Permit Laws (undated) — Georgia Department of Public Safety, Motor Carrier Compliance Division — width 8'6"; height 13'6"; length 100 ft including overhang; 53 ft standard trailer; 80,000 lb gross; "Legal axle weight is 20,340 pounds."; federal bridge formula
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Indiana — superload gross-weight threshold

over 200,000 lb Indiana DOR — Oversize/Overweight Vehicle Permit Fees (July 2026, PDF) — Indiana Department of Revenue, Motor Carrier Services — legal limits; single-trip oversize and overweight tables; "Whichever of the calculated oversize or overweight fees is greater"; super load thresholds. Month-only date, recorded as the 1st.
rev. 2026-07-01 · read 2026-09-01
over 108,000 lb Indiana State Police — Superload escorts — Indiana State Police — "Width exceeding 17 feet; Height exceeding 15 feet; Length exceeding 110 feet; Weight exceeding 108,000 pounds"
undated document · read 2026-09-01
over 120,000 lb Indiana DOR — Motor Carrier Services frequently asked questions — Indiana Department of Revenue — "A 'Superload' is any load that exceeds 15 feet high, 16 feet wide, 110 feet long, and/or 120,000 pounds, or fails the overload analysis."
undated document · read 2026-09-01
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Indiana — superload width threshold

over 17' Indiana DOR — Oversize/Overweight Vehicle Permit Fees (July 2026, PDF) — Indiana Department of Revenue, Motor Carrier Services — legal limits; single-trip oversize and overweight tables; "Whichever of the calculated oversize or overweight fees is greater"; super load thresholds. Month-only date, recorded as the 1st.
rev. 2026-07-01 · read 2026-09-01
over 16' 105 IAC 10-1.5-3 — Oversize/overweight vehicle permit fees (Indiana Register) — Indiana Register / Indiana Department of Revenue — (a) administrative fees; (b) oversize base fees $20/$30/$40; (c) $20 overweight base fee; (h) the full fee schedule; "superload" definition
rev. 2025-05-16 · read 2026-09-01
over 16' Indiana DOR — Motor Carrier Services frequently asked questions — Indiana Department of Revenue — "A 'Superload' is any load that exceeds 15 feet high, 16 feet wide, 110 feet long, and/or 120,000 pounds, or fails the overload analysis."
undated document · read 2026-09-01
over 17' Indiana State Police — Superload escorts — Indiana State Police — "Width exceeding 17 feet; Height exceeding 15 feet; Length exceeding 110 feet; Weight exceeding 108,000 pounds"
undated document · read 2026-09-01
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Michigan — axle-load table by axle spacing

the federal loading maximum, MCL 257.722(12): any single axle, at any spacing → 20,000 lb MCL 257.722 — axle load maxima (Michigan Legislature) — Michigan Legislature — (1)(a)-(d) the normal loading maximum; (2)-(3) the 16,000 lb tandem on designated highways; (7) 700 lb per inch of tyre; (11) how weight is measured; (12) the federal table and the regime selector; (14)-(15) natural-gas and battery-electric allowances; last amendment "Am. 2024, Act 106, Eff. Apr. 2, 2025"
rev. 2025-04-02 · read 2026-09-05
the normal loading maximum, MCL 257.722(1) as the statute writes it: (a) axle spacing 9 feet or more between axles → 18,000 lb; (b) less than 9 feet between 2 axles but MORE THAN 3 1/2 feet → 13,000 lb; (c) axles spaced less than 3 1/2 feet apart → 9,000 lb — one tandem assembly at 16,000 lb per axle only on mi-designated highways MCL 257.722 — axle load maxima (Michigan Legislature) — Michigan Legislature — (1)(a)-(d) the normal loading maximum; (2)-(3) the 16,000 lb tandem on designated highways; (7) 700 lb per inch of tyre; (11) how weight is measured; (12) the federal table and the regime selector; (14)-(15) natural-gas and battery-electric allowances; last amendment "Am. 2024, Act 106, Eff. Apr. 2, 2025"
rev. 2025-04-02 · read 2026-09-05
the axle-load table as MDOT T-1 (05/2024) prints it: 9 feet or more between axles → 18,000 lb; more than or equal to 3 1/2 feet but less than 9 feet → 13,000 lb; less than 3 1/2 feet apart → 9,000 lb — one tandem assembly at 16,000 lb per axle, with NO route condition stated MDOT T-1 — Maximum Legal Truck Loadings and Dimensions — Michigan Department of Transportation — form stamp "T-1 (05/2024)"; designated/non-designated width and length table; axle-load table; the tandem footnote
rev. 2024-05 · read 2026-09-05
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Minnesota — legal single-axle weight

20,000 lb Minn. Stat. § 169.823 — Pneumatic-tired vehicles: wheel and axle limits — Office of the Revisor of Statutes, State of Minnesota — subd. 1(1)-(4) and subd. 2
undated document · read 2026-09-05
18,000 lb Minn. Stat. § 169.823 — Pneumatic-tired vehicles: wheel and axle limits — Office of the Revisor of Statutes, State of Minnesota — subd. 1(1)-(4) and subd. 2
undated document · read 2026-09-05
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Mississippi — legal gross weight

80,000 lb Miss. Code Ann. § 63-5-33 (via FindLaw — SECONDARY source) — FindLaw, reproducing the Mississippi Code Annotated — Table III — 80,000 lb, but only on highways the Commission has designated as capable of the maximum load limits; the federal bridge formula; FindLaw states "Current as of January 01, 2025"
rev. 2025-01-01 · read 2026-09-05
57,650 lb Miss. Code Ann. § 63-5-29 (via FindLaw — SECONDARY source) — FindLaw, reproducing the Mississippi Code Annotated — Table I — undesignated highways, "36 and greater — 57,650 maximum", measured longitudinally to the nearest foot; FindLaw states "Current as of January 01, 2025"
rev. 2025-01-01 · read 2026-09-05
80,000 lb MDOT — Permit & Motor Carrier Division Manual (9/21/2024) — Mississippi Department of Transportation — cover "PERMIT & MOTOR CARRIER DIVISION MANUAL 9/21/2024"; definitions 2, 3, 4, 15, 18, 19, 21; General Permit Regulations; Super Load section
rev. 2024-09-21 · read 2026-09-05
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Mississippi — superload gross-weight threshold

over 189,999 lb MDOT — Permit & Motor Carrier Division Manual (9/21/2024) — Mississippi Department of Transportation — cover "PERMIT & MOTOR CARRIER DIVISION MANUAL 9/21/2024"; definitions 2, 3, 4, 15, 18, 19, 21; General Permit Regulations; Super Load section
rev. 2024-09-21 · read 2026-09-05
189,999 lb or more MDOT — Permit & Motor Carrier Division Manual (9/21/2024) — Mississippi Department of Transportation — cover "PERMIT & MOTOR CARRIER DIVISION MANUAL 9/21/2024"; definitions 2, 3, 4, 15, 18, 19, 21; General Permit Regulations; Super Load section
rev. 2024-09-21 · read 2026-09-05
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

New York — single-trip base permit fee

$40 17 NYCRR Subpart 154-1 — Special Hauling Permits (PDF) — New York State Department of Transportation — §154-1.2(b)(1) trip permit definition; §154-1.20 fee table, form PERM43 (9/95); three-way movement = two permit fees
rev. 1995-09-01 · read 2026-09-01
$60 17 NYCRR Subpart 154-1 — Special Hauling Permits (PDF) — New York State Department of Transportation — §154-1.2(b)(1) trip permit definition; §154-1.20 fee table, form PERM43 (9/95); three-way movement = two permit fees
rev. 1995-09-01 · read 2026-09-01
$40 NYSDOT — Special Hauling Permit Fees — New York State Department of Transportation — trip permit table — every type $40 with a $10 amendment fee; page carries no revision date
undated document · read 2026-09-01
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

New York — superload length threshold

160' or more NYSDOT PERM 12S — Superload Permit Requirements (PDF) — New York State Department of Transportation — superload definition with INCLUSIVE length boundary; bond schedule; police escorts for all superloads. Month-only date, recorded as the 1st.
rev. 2014-02-01 · read 2026-09-01
over 160' NYSDOT — Superloads — New York State Department of Transportation — superload definition: over 16 ft wide; 16 ft or more high; over 160 ft long; 200,000 lb or more
undated document · read 2026-09-01
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

North Carolina — legal height

13'6" NCDOT — 2024 EVO Handbook (PDF), the WRITTEN measurement in the height sentence — North Carolina Department of Transportation — "Height is greater than thirteen feet six inches (14')." — reading the WORDS: 13 ft 6 in
rev. 2024-01-01 · read 2026-09-02
14' NCDOT — 2024 EVO Handbook (PDF), the PARENTHETICAL in the height sentence — North Carolina Department of Transportation — "Height is greater than thirteen feet six inches (14')." — reading the PARENTHETICAL: 14 ft
rev. 2024-01-01 · read 2026-09-02
14' N.C. Gen. Stat. §20-116 — Size of vehicles and loads — North Carolina General Assembly — width 102 in; height 14 ft; the 53 ft semitrailer exemption from the 60 ft combination limit
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

North Carolina — superload width threshold

over 16' NCDOT — 2024 EVO Handbook (PDF) — North Carolina Department of Transportation — superload triggers; height-pole specification; EVO course payment
rev. 2024-01-01 · read 2026-09-02
17' or more NCDOT — Superload Publication (SL-6), Rev. 1/20 (PDF) — North Carolina Department of Transportation — "Width: 17' or greater"; "$3.00 per 1,000 lbs. over 132,000 lbs. gross weight."; "$100 non-refundable application fee"; 10 business days
rev. 2020-01-01 · read 2026-09-02
over 16'11" NCDOT — Single Trip Publication (ST-1), Rev. 11/19 (PDF) — North Carolina Department of Transportation — "Permit is valid for 10 calendar days. Cost for permit is $12 per dimension over the legal limit."; "Width: 16' 11" maximum."
rev. 2019-11-01 · read 2026-09-02
over 16' NCDOT — Oversize/Overweight Permit Handbook (PDF, undated) — North Carolina Department of Transportation — "Fee $12 - $48 (state fee)"; "Width 16 feet maximum"; 40 ft single vehicle / 60 ft combination; the 150 ft escort row; the steer-axle superload row
undated document · read 2026-09-02
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Tennessee — route-inspection height trigger

over 15'6" Tenn. Code Ann. § 55-7-205 — Special permits and fees (via Justia — SECONDARY source) — Justia, reproducing the Tennessee Code Annotated — (h)(1)(A)-(D) the width ladder and the houseboat bands; (h)(2) "Excessive height or length: Twenty dollars ($20.00)"; (h)(3) "Excessive weight: Twenty dollars ($20.00) plus six cents (6¢) per ton-mile;"; (h)(4)(A)-(C) the bridge evaluation charges; (l)(1) the ten-day validity; (n)(5)(E)(i) the heavy-duty towing 12¢ ton-mile tier; (p) the route-survey height trigger
rev. 2025 · read 2026-09-03
15' or more Tenn. Comp. R. & Regs. 1680-07-01-.10 — Height pole and route survey (via Cornell LII — SECONDARY source) — Cornell Legal Information Institute, reproducing the Tennessee Compilation Rules & Regulations — (1)(c) the route survey "If the height of the movement is fifteen feet (15') or more"; (1)(d) "When the permitted vehicle and load exceeds fifteen feet (15') in height, the permittee shall determine all vertical clearances by use of a front escort vehicle having protrusions equal to, at a minimum, the height of the permitted vehicle and load."
rev. 2018-05-15 · read 2026-09-03
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Texas — route-inspection height trigger

19' or more 43 Tex. Admin. Code §219.11 (via Cornell LII — SECONDARY source) — Cornell Legal Information Institute, reproducing 43 TAC — escort requirements (k); route inspection triggers (h)(4), (i)(7), (j)(2); amended eff. 2024-07-18, 49 Tex. Reg. 28
rev. 2024-07-18 · read 2026-08-31
over 18'11" TxDMV — General Single-Trip Permits — Texas Department of Motor Vehicles
undated document · read 2026-08-31
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Wisconsin — legal overall length

70' Wis. Stat. ch. 348 — Vehicles: size, weight and load — Wisconsin Legislative Reference Bureau — "2023-24 Wisconsin Statutes updated through 2025 Wis. Act 247 ... in effect on September 4, 2026. Published and certified under s. 35.18."
rev. 2026-09-04 · read 2026-09-05
75' WisDOT — Oversize/overweight permit requirements — Wisconsin Department of Transportation — undated ASPX page; no revision stamp anywhere on it
undated document · read 2026-09-05
What that means for a quote

Both documents are in effect and both are official. Neither has been adopted: the engine returns no value for this field, and a quote that depends on it is sent to the issuing agency rather than being priced from whichever document was read first.

Louisiana — one fee band, two amounts

$10 oversize single trip (statute: $10 per trip or per operating day)
La. R.S. 32:387 — Special permits for excessive size and weight (via Justia) — Justia, reproducing the Louisiana Revised Statutes — subsection H — the $10 oversize fee, the three overweight schedules, the 232,001 lb route restriction and the over-254,000 lb ton-mile formula with its structural evaluation fees
rev. 2025 · read 2026-09-03
$8 oversize single trip (administrative code: $8 per trip or per day)
La. Admin. Code tit. 73, §I-303 — Permit fees and restrictions — Justia, reproducing the Louisiana Administrative Code — "The fee is $8 for a single trip if the trip lasts less than one day or $8 for a single day if the trip lasts more than one day."; current through Register Vol. 51, No. 06
rev. 2025-06-20 · read 2026-09-03
What that means for a quote

Two schedules band the same load the same way and price it differently. The difference reaches the applicant directly: a load that falls in this band is quoted as a spread, and the permit is sent to the agency to price.

Minnesota — one fee band, two amounts

$120 seasonal width surcharge — over 14 ft 6 in while load restrictions are in effect
Minn. Stat. § 169.86 — Special permits; fees — Office of the Revisor of Statutes, State of Minnesota — subd. 5(a) $15 single trip, subd. 5(e) the overweight axle group cost factors, subd. 5(g) the $120 seasonal width surcharge, subd. 5a the excessive-gross-weight tax; History "2012 c 287 art 3 s 35"
rev. 2012 · read 2026-09-05
$0 over 14 ft 6 in with no seasonal load restrictions in effect — no surcharge
Minn. Stat. § 169.86 — Special permits; fees — Office of the Revisor of Statutes, State of Minnesota — subd. 5(a) $15 single trip, subd. 5(e) the overweight axle group cost factors, subd. 5(g) the $120 seasonal width surcharge, subd. 5a the excessive-gross-weight tax; History "2012 c 287 art 3 s 35"
rev. 2012 · read 2026-09-05
What that means for a quote

Two schedules band the same load the same way and price it differently. The difference reaches the applicant directly: a load that falls in this band is quoted as a spread, and the permit is sent to the agency to price.

North Carolina — one fee band, two amounts

$12 over legal width, between 13 ft 6 in and 14 ft high — one over-legal dimension at $12, reading the legal height as the statute’s 14 ft
N.C. Gen. Stat. §20-119 — Special permits for oversize/overweight vehicles — North Carolina General Assembly — "$12.00 for each dimension over lawful dimensions, including height, length, width, and weight up to 132,000 pounds"; $3.00 per 1,000 lb above that; the $100 engineering-study application fee
undated document · read 2026-09-02
$24 over legal width, between 13 ft 6 in and 14 ft high — two over-legal dimensions at $24, reading the legal height as the EVO Handbook’s written 13 ft 6 in
NCDOT — 2024 EVO Handbook (PDF), the WRITTEN measurement in the height sentence — North Carolina Department of Transportation — "Height is greater than thirteen feet six inches (14')." — reading the WORDS: 13 ft 6 in
rev. 2024-01-01 · read 2026-09-02
What that means for a quote

Two schedules band the same load the same way and price it differently. The difference reaches the applicant directly: a load that falls in this band is quoted as a spread, and the permit is sent to the agency to price.

Pennsylvania — one fee band, two amounts

$97 over 14 ft wide — PennDOT current schedule
PennDOT — Hauling Permit Fees, effective July 1 2025 (PDF) — Pennsylvania Department of Transportation — row "66 - A Vehicle (Oversize) Single Trip"; heading "PERMIT FEES – EFFECTIVE JULY 1, 2025"
rev. 2025-07-01 · read 2026-09-01
$71 over 14 ft wide — 75 Pa.C.S. §1942 statutory amount
75 Pa.C.S. §1942 — Fees for permits (statutory, pre-CPI amounts) — Pennsylvania General Assembly — (a)(1) $35 up to 14 ft wide; (a)(2) $71 over 14 ft; (a)(3) 4¢ per mile per ton; (b) fees are cumulative
rev. 2014-07-01 · read 2026-09-01
What that means for a quote

Two schedules band the same load the same way and price it differently. The difference reaches the applicant directly: a load that falls in this band is quoted as a spread, and the permit is sent to the agency to price.

The gaps

15 gaps where nothing at all is priced

A different failure, and a more surprising one: not two documents disagreeing about a value, but two documents that between them leave a range covered by neither. A move landing inside one of these bands matches no published fee at all.

Arkansas — A move of exactly 251 miles is priced by nothing

ARKANSAS_251_MILE_GAP

What the two schedules leave uncovered

Ark. Code §27-35-210(e)(2) bands the per-ton charge "201 miles to 250 miles, inclusive" and then "Over 251 miles", which prices no move of exactly 251 miles. ARDOT Permit Rules Appendix 3 and 27 CAR Part 111 Appendix both read "251 miles or more" and do price it. Only the range all three documents name — 252 miles and up — is priced here; a 251-mile move matches no band and the permit fee must be confirmed with the Permit Section.

Washington — A 999-pound band where neither document sets a fee

WASHINGTON_999_POUND_GAP

What the two schedules leave uncovered

The statute prices "95,000-99,999 pounds . . . . $ 3.87" while WSDOT's own schedule bands the same step as "95,000-99,000". Between 179,001 lb and 179,999 lb the two documents do not cover the same ground, so no fee is quoted. Reading the statute's figure into the schedule's gap would resolve, in favour of one document, a defect that consists precisely of the two not ending the band in the same place.

Tennessee — A width band that opens one inch apart in two documents

TENNESSEE_WIDTH_BAND_GAP

What the two schedules leave uncovered

Tenn. Code Ann. § 55-7-205(h)(1)(B) opens its $30 band immediately above 14 ft 0 in while TDOT's published fee table opens it at 14 ft 1 in. The $20 band closes at exactly 14 ft 0 in on both readings. A width strictly between 14 ft 0 in and 14 ft 1 in is therefore priced by no band either document publishes, and the permit fee must be confirmed with the TDOT Permit Office.

Tennessee — 3 escort boundaries that decide a requirement, not a price

TENNESSEE_ESCORT_BOUNDARY_GAPS

What the two schedules leave uncovered

Between 10' and 10'1": the rule reads "over ten feet (10') wide but not exceeding twelve feet six inches (12'6")" while the agency FAQ reads "10'1” – 12'6”". Between 12'6" and 12'7": the rule reads "over twelve feet six inches (12'6") wide but not exceeding thirteen feet six inches (13'6")" while the agency FAQ reads "12'7” – 13'6”". Between 13'6" and 13'7": the rule reads "over thirteen feet six inches (13'6") wide but not exceeding sixteen feet (16')" while the agency FAQ reads "13'7” and greater" (our own observation, following identically from the two texts).

Tennessee — A houseboat priced eight times apart by two official schedules

TENNESSEE_HOUSEBOAT_CONFLICT_ANALYSIS

What the two schedules leave uncovered

The statute and agency website list three distinct stepped bands starting at 16' ($500, $750, $1,000), whereas the older administrative code imposes a base fee of $2,500 + $100/inch above 17'.

Michigan — The 164,000 lb figure is published without the configuration that reaches it

MICHIGAN_164000_RECONSTRUCTION

What the two schedules leave uncovered

MDOT publishes 164,000 lb as the maximum allowable gross vehicle weight and states it is the result of the eleven-axle cap and the per-axle spacing maxima, not a statutory figure. It does not publish the configuration. One arrangement that reaches it under MCL 257.722(1)-(3) is 3 axles at 18,000 lb (each 9 ft or more from its neighbours) + 1 tandem assembly at 16,000 lb per axle + 6 axles at 13,000 lb = 54,000 + 32,000 + 78,000 = 164,000 lb. THAT ARITHMETIC IS OURS, NOT MICHIGAN’S, it is offered only as evidence the number is reachable, and it is encoded in no rule, fee or limit in this file.

Michigan — An annual permit fee keyed to the first letter of the applicant's name

MICHIGAN_NAME_LETTER_PRORATION

What the two schedules leave uncovered

A new Michigan extended (annual) permit is prorated once, from a 12x12 matrix crossing the month the existing permit expires with THE FIRST LETTER OF THE APPLICANT COMPANY’S NAME: $30-$57 for an oversize permit and $100-$191 for an overweight one, with farm-to-farm-only permits at 10% of the overweight prorated fee. MDOT’s worked example: "The new extended transport fee for the oversize permit (prorated this year only) is $47.00." No field in this model expresses a fee keyed to an applicant’s name, and none is invented. The sheet itself carries NO printed revision date and its PDF was created on 2010-07-20 — sixteen years old and still the live linked schedule. It leaves June, July and August unassigned to any letter group, and says nothing about a company name beginning with a digit.

Michigan — michigan.gov serves superseded editions of MDOT’s own operational documents

MICHIGAN_SUPERSEDED_EDITIONS

What the two schedules leave uncovered

Two official MDOT hosts serve different editions of the same two documents, and only one host is current. MDOT T-1 (04/19) — SUPERSEDED copy still served by michigan.gov at https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Business/Truckers/Rules-and-Guidelines/Maximum-Legal-Truck-Loadings-Dimensions.pdf is superseded by T-1 (05/2024) at mdotjboss.state.mi.us. MDOT T-2 (11/22) — SUPERSEDED copy still served by michigan.gov at https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Business/Truckers/Rules-and-Guidelines/Moving-Oversize-Overweight-Vehicles-Loads.pdf is superseded by T-2 (10/2023) at mdotjboss.state.mi.us. These are different editions rather than reflows — the michigan.gov T-2 runs to eight pages against the permit host’s five. Every Michigan value on this site is taken from the permit host’s current copies, and no value is taken from the superseded ones, because their contents were not transcribed and writing down what they probably said would manufacture history.

Mississippi — An overweight rate printed in the wrong unit, 200 times apart

MISSISSIPPI_OVERWEIGHT_RATE_UNIT_CONFLICT

What the two schedules leave uncovered

Read literally, ".05 cents" is $0.0005 per 1,000 lb per mile and a 100,000 lb load over 100 Mississippi miles costs $1.00 in excess-weight charge. Read as the industry reads it — five cents, $0.05 — the same move costs $100.00. A factor of ONE HUNDRED, in the only document that states a Mississippi permit price. There is NO statutory backstop: Miss. Code Ann. § 63-5-51 authorises the permit and sets no fee, no formula and no fee-setting delegation, and both the Rule and the Manual describe overweight pricing as "based on weight and per mile travel" without a rate. Three further inputs the same sentence never supplies: whether a part-thousand pounds rounds up, down or pro rata; whether mileage is whole miles, rounded or true distance; and WHICH excess the charge runs on, since gross over 80,000, a single axle over 20,000 and a tandem over 34,000 are joined by "or" with no stated basis. Neither reading has been adopted and no Mississippi overweight amount is quoted.

Mississippi — A heavy-haul axle table rewritten wholesale between two live documents

MISSISSIPPI_SPECIAL_HEAVY_HAUL_TABLE_CONFLICT

What the two schedules leave uncovered

Both documents print a table headed "Maximum Axle Weights and Minimum Spacing / Special Heavy Haul Blanket Permit" and they do not agree on a single row above five axles. SIX AXLES: the Rule prints 80,000-120,000 lb with a 14,000 lb steering axle, a 42,000 lb tandem and a 64,000 lb tri-axle; the Manual prints 80,000-117,000 lb with a 15,000 lb steering axle, a 45,000 lb tandem and a 57,000 lb triaxle. SEVEN AXLES OR MORE: the Rule prints 80,000-150,000 lb with a 56,000 lb tandem and an 80,000 lb quad; the Manual prints 80,000-142,000 lb with a 45,000 lb tandem and a 60,000 lb quad. The Manual also introduces an "Eight Axles or More (80,000 lbs. to 150,000 lbs.)" row the Rule does not have. The differences run to 20,000 lb on a quad group and 8,000 lb of allowed gross. The five-axle row (14,000 / 40,500 / 40,500) is the one row both share. Anyone pricing a Mississippi Special Heavy Haul move must know which table the permit writer is using. Neither has been adopted, and this engine does not price the annual blanket product.

Mississippi — An annual blanket envelope that gains a height limit in one document

MISSISSIPPI_BLANKET_ENVELOPE_CONFLICT

What the two schedules leave uncovered

Rule § 900: "Authorizes the movement of loads not exceeding 14 feet in width, 120 feet in length with no more than 14 feet 11 inches rear overhang and must be one continuous piece." — no height at all. Manual: "This permit authorizes the movement of loads not exceeding fourteen (14) feet in width, FOURTEEN (14) FEET IN HEIGHT, one hundred twenty (120) feet in length, with no more than fourteen (14) feet eleven (11) inches rear overhang." A 14 ft 6 in high, 12 ft wide load is inside the Rule’s envelope and outside the Manual’s — covered by the $100 annual blanket under one document and needing a separate single-trip permit under the other.

Mississippi — The same $200 permit lasts a year in one document and a month in the other

MISSISSIPPI_POLE_BLANKET_CONFLICT

What the two schedules leave uncovered

The fee sheet lists "Pole Blanket $200.00" under Blanket Fees and states that "The Blanket Permits are not prorated, all permits are issued for one (1) year unless otherwise specified". The Manual states "The Pole Blanket Permit is valid for one (1) month at a cost of $200.00 per fleet of vehicles." A twelvefold difference in what $200 buys. The fee sheet’s "unless otherwise specified" arguably yields to the Manual, but the fee sheet does not itself specify otherwise. Both on file; neither adopted.

South Carolina — A superload impact fee that states a rate and no basis

SOUTH_CAROLINA_SUPERLOAD_IMPACT_FEE_CONFLICT

What the two schedules leave uncovered

The fee table states a rate and no basis. Read on the ENTIRE gross vehicle weight, a 180,000 lb load pays $540; read on the EXCESS over 130,000 lb it pays $150. The statute’s OTHER per-poundage fee, § 57-3-130(B)(5), is explicit — "there is an additional megaload impact fee assessed ON THE ENTIRE GROSS VEHICLE WEIGHT on a pounds per mile basis" — so the drafter used the word in one place in the section and omitted it in the other. Reading the superload fee on the entire GVW makes that clarification redundant; reading it on the excess makes the two fees inconsistent in basis. THAT IS AN ARGUMENT, NOT AN ANSWER, and neither reading has been adopted. Two further inputs are unpublished: whether a part increment (130,500 lb is half an increment over) rounds up, down or pro rata, and whether the impact fee STACKS with the engineering-analysis fee, which triggers at the same "Over 130,000 pounds". The Guidelines Rev. 3/2026 reprint both lines verbatim and add nothing.

South Carolina — Four width fee steps, and no published order of operations

SOUTH_CAROLINA_EXCESSIVE_WIDTH_STEPS

What the two schedules leave uncovered

§ 57-3-130(A) prints $35 over 16 ft, $40 over 18 ft, $45 over 20 ft, $50 over 22 ft as separate line items in the same table as the $30 single-trip permit, and neither the statute nor SCDOT’s Guidelines says whether a step REPLACES that fee or is ADDED to it — $35 or $65 on a 17-ft-wide load. Every band they could occupy also starts above South Carolina’s own 16 ft permit ceiling, where a load is no longer issued over the counter but goes through the Resident Maintenance Engineer as a frame building, capped at thirty miles with four escorts and per-county sign-off. Neither reading has been adopted and no width step is priced. § 57-3-130(A): "Superload Engineer Analysis Over 130,000 pounds $100.00 / Superload Engineer Analysis Over 200,000 pounds $200.00 / Superload Engineer Analysis Over 300,000 pounds $350.00", plus a "Superload Application (Non-Refundable) $100.00" — the ONLY non-refundable fee in South Carolina, where everything else is returned on denial. All three analysis boundaries are exclusive. WHETHER THE BANDS ARE CUMULATIVE OR EXCLUSIVE IS NOT PUBLISHED: at 350,000 lb the analysis fee is either $350 or $100+$200+$350 = $650. Bands in a fee ladder are normally exclusive and that is the natural reading, but neither document says so, and $300 is not a rounding question. These are SCDOT’s review charges; the independent structural analysis the Guidelines "may require the carrier to provide" above 300,000 lb is the carrier’s own cost and is unquantified. None of this is quoted, because a load over 130,000 lb is a South Carolina superload and the engine prices no superload.

South Carolina — A superseded copy of the Guidelines is still served by scdot.org

SOUTH_CAROLINA_SUPERSEDED_GUIDELINES

What the two schedules leave uncovered

A five-year-old copy of the Guidelines is still served at a second scdot.org URL. It is a WARNING RATHER THAN A SUBSTANTIVE CONFLICT: the fee table and the entire escort section were compared line by line against Rev. 3/2026 and are IDENTICAL, so no figure in this file changes either way. But the sections that DID change between the two — permit types, superload tiers and travel times — would be silently wrong for anyone who landed on the older URL, which carries no indication that it has been superseded. Every row in this file is taken from Rev. 3/2026.

Method

How this page is made

The page stays current for free and grows as jurisdictions are added. It is not a document somebody maintains.

The mechanism, in full

The engine stores every value as a list of candidates, each with its own source document, effective window and pinpoint cite. Resolving a field filters to the candidates in effect on the quote date and — when they disagree — returns no value, with both candidates attached and a warning. This page renders those refusals.

Figures in circulation that no primary document supports →

Common questions

Questions

Why not just pick the more recent document?

Because "more recent" is not the same as "in force". A statute and an administrative code can both be current and say different things, and one of them being older does not repeal it. Adopting one would put a single confident number where the honest answer is a range with two citations attached.

Does this page go stale?

It is generated from the data, so it follows the data. Adding a state adds its conflicts; correcting a source removes the entry it was in. Nothing on this page is typed prose about a number.

What should I actually do about one of these?

Ring the permit office knowing exactly what to ask. That is what the page is for: it names both documents and the pinpoint cite in each, so the question is "which of these two do you charge" rather than "how much is it".