legal height
rev. 2024-01-01 · read 2026-09-02
rev. 2024-01-01 · read 2026-09-02
undated document · read 2026-09-02
Both are in effect and neither has been adopted.
State profile · North Carolina
Legal limits, escort triggers, permit fees, the superload line and the police escort position for North Carolina — every figure carrying the state document behind it.
The short version: a North Carolina single-trip permit starts at $0 before bands, overweight and the transaction charge; an escort is first required at over 12' wide; and the load becomes a superload at over 132,000 lb. Everything below carries the North Carolina document it came from, that document's own revision date, and the date we read it.
Anything over one of these needs a permit. Every value links to the document that sets it.
| Measure | Legal limit |
|---|---|
| Width | 8'6"undated document · read 2026-09-02 |
| Height | Sources disagree13'6" per "Height is greater than thirteen feet six inc… — versus — 14' per "Height is greater than thirteen feet six inc… — versus — 14' per width 102 in; height 14 ft; the 53 ft semitra… |
| Semitrailer length | 53'undated document · read 2026-09-02 |
| Overall length | None published |
| Kingpin to rear axle | None published |
| Front overhang | None published |
| Rear overhang | None published |
| Gross weight | 80,000 lbundated document · read 2026-09-02 |
| Single axle | 20,000 lbundated document · read 2026-09-02 |
| Tandem axle | 38,000 lbundated document · read 2026-09-02 |
| Measurement | First escort trigger | First police escort trigger |
|---|---|---|
| Width | over 12'rev. 2024-08-01 · read 2026-09-02 | None published |
| Height | over 14'5"rev. 2024-08-01 · read 2026-09-02 | None published |
| Length | over 110'rev. 2024-08-01 · read 2026-09-02 | None published |
| Rear overhang | 15' or morerev. 2024-08-01 · read 2026-09-02 | None published |
| Gross weight | over 149,999 lbrev. 2024-08-01 · read 2026-09-02 | None published |
| Charge | Amount |
|---|---|
| Single-trip base | $0undated document · read 2026-09-02 |
| Transaction / card | Not yet covered |
| Route analysis review | $100rev. 2020-01-01 · read 2026-09-02 |
| Route with no bridges | $100undated document · read 2026-09-02 |
| Band | Fee |
|---|---|
| over legal width, 13 ft 6 in high or under — one over-legal dimension at $12 | $12undated document · read 2026-09-02 |
| over legal width and over 14 ft high — two over-legal dimensions at $12 each | $24undated document · read 2026-09-02 |
| over 14 ft high at legal width — one over-legal dimension at $12 | $12undated document · read 2026-09-02 |
| over legal width, between 13 ft 6 in and 14 ft high — one over-legal dimension at $12, reading the legal height as the statute’s 14 ft | $12undated document · read 2026-09-02 |
| over legal width, 13 ft 6 in high or under — one over-legal dimension at $12 | $12rev. 2024-01-01 · read 2026-09-02 |
| over legal width and over 14 ft high — two over-legal dimensions at $12 each | $24rev. 2024-01-01 · read 2026-09-02 |
| over 14 ft high at legal width — one over-legal dimension at $12 | $12rev. 2024-01-01 · read 2026-09-02 |
| over legal width, between 13 ft 6 in and 14 ft high — two over-legal dimensions at $24, reading the legal height as the EVO Handbook’s written 13 ft 6 in | $24rev. 2024-01-01 · read 2026-09-02 |
The Superload Publication states the tier above the threshold as "$3.00 per 1,000 lbs. over 132,000 lbs. gross weight.", added to the dimensional fee.
Above one of these, the state stops issuing over the counter and prices the move after an engineering review.
| Trigger | Threshold |
|---|---|
| Gross weight | over 132,000 lbrev. 2024-01-01 · read 2026-09-02 |
| Width | Sources disagreeover 16' per superload triggers; height-pole specification… — versus — 17' or more per "Width: 17' or greater"; "$3.00 per 1,000 lbs… — versus — over 16'11" per "Permit is valid for 10 calendar days. Cost f… — versus — over 16' per "Fee $12 - $48 (state fee)"; "Width 16 feet m… |
| Height | None published |
| Length | None published |
| Short axle spacing | Not yet covered |
The dimensions at which North Carolina triggers a physical route inspection or an engineering review, and what the agency charges to review it.
| Measurement | Inspection / review trigger |
|---|---|
| Width | Not yet covered |
| Height | Not yet covered |
| Length | Not yet covered |
Charges exist and no schedule is published. One of the three escorts over 16 ft wide must be a State Highway Patrol escort. The Highway Patrol publishes no hourly or per-mile rate; G.S. §143B-1729 requires only "a fee covering the full cost to administer, plan, and carry out the escort".
This is a positive finding: we searched and there is nothing to quote. It is not the same as "no police escort is ever required here".
Holiday, curfew and night-travel windows are not yet encoded for North Carolina.
North Carolina spring thaw restrictions →
They are not guessed at here. What we do publish is the seasonal weight-restriction picture, with the date we last read each state's own bulletin — a curfew invented from a plausible pattern is worth less than an honest gap, because a reader cannot tell the two apart on the page.
The agency behind each figure above is linked from that figure. We publish no per-state permit-office phone number.
We are not publishing per-state permit-office phone numbers yet, and the reason is worth stating: the two seed lists available for them are both demonstrably stale — the federal one gives two different states the same phone number — and a wrong number on a page like this costs somebody a morning. The agency behind each figure above is linked from that figure, which is the part we can stand behind today.
Two official documents, both in effect, giving different answers. Neither has been adopted.
Both are in effect and neither has been adopted.
Both are in effect and neither has been adopted.
Two schedules band the same load the same way and price it differently.
Named rather than gestured at, because each of these can exceed the permit itself. Every item is listed; open one for why it is excluded.
This is a permit fee, not a freight rate.
We hold no rate data, and the two commercial sites that publish market rates disagree by nearly a factor of two on the same service.
The agency's review fee is shown where the state publishes one; the engineer's own fee is a private cost with no schedule.
Set per move by the agency, and in at least one state the escort is billed at actual cost against it.
Arranged with each utility, priced by each utility.
A toll, bridge or city authority inside the same state issues its own permit, and a state total that omits it is missing a whole permit.
Need a pilot car for this lane? Browse the pilot car & escort directory.
The single-trip base is $0, before the dimension bands, the overweight component and the transaction charge. The base alone is rarely what is paid.
The first width trigger is over 12'.
North Carolina's published gross-weight superload line is over 132,000 lb. It is not 80,000 lb; that is the federal legal gross limit, not a superload threshold.
Yes, in 3 place(s) we hold both documents for. They are set out in full above, each with its pinpoint citation, and none of them has been adopted.