Province profile · Manitoba

Manitoba oversize and overweight permit fees

Every figure in Canadian dollars, each carrying the Manitoba document behind it.

1 source document on fileoldest revision 2020-09-11last retrieved 2026-10-038 published fee rowsFigures in CAD, never convertedFree · no account needed

The Manitoba answer

The two permit products, their published shape, and the date the figures took effect. Every number links to the document it came from.

Oversize

Product
Overdimensional permit, single trip (HTA s. 87)single-trip
Fee
8 published bandsin effect from

Overweight

Product
Overweight permit, non-annual (HTA s. 87)single-trip
Fee
Priced per kilometreThese are different permits — the move needs both, each priced on its own

Provenance

Documents on file
1A statute, regulation or ministry fee schedule is held and encoded
Oldest document
last read

The short version: the Manitoba oversize product is the Overdimensional permit, single trip (HTA s. 87), priced across 8 published dimensional bands; overweight is the Overweight permit, non-annual (HTA s. 87), priced by the kilometre travelled inside the province. Every figure on this page is in Canadian dollars, exactly as its source publishes it, and nothing here is converted.

Corridor

1. Where the load goes next

The bordering jurisdictions, each carrying the one fact that decides whether that border is the expensive one. A multi-jurisdiction lane is the actual job, and this is one click rather than a return to the index.

Compare Manitoba with its neighbours →

Oversize fees

2. Manitoba oversize permit fees

MeasurementPublished bandFee (CAD)As published
Width over 2.6 m up to 3.05 mover about 8 ft 6 in · up to about 10 ft — Published band starts at 2.61 m; the bound is set at over 2.60 m so a load between 2.60 m and 2.61 m does not fall through the gap unpriced. CA$8.40 s. 33(1)(a) width of 2.61 m to 3.05 m, $8.40 single trip
Width over 3.05 m up to 3.7 mover about 10 ft · up to about 12 ft 2 in CA$21 s. 33(1)(b) width of 3.06 m to 3.70 m, $21 single trip
Width over 3.7 m up to 4.3 mover about 12 ft 2 in · up to about 14 ft 1 in CA$50.40 s. 33(1)(c) width of 3.71 m to 4.30 m, $50.40 single trip
Width over 4.3 mover about 14 ft 1 in CA$100.80 s. 33(1)(d) width of 4.31 m or more, $100.80 single trip
Length over 20 m up to 23 mover about 65 ft 7 in · up to about 75 ft 6 in CA$8.40 s. 33(1)(f) length of 20.1 m to 23 m, $8.40 single trip
Length over 23 m up to 30 mover about 75 ft 6 in · up to about 98 ft 5 in CA$11.20 s. 33(1)(g) length of 23.1 m to 30 m, $11.20 single trip
Length over 30 mover about 98 ft 5 in CA$16.80 s. 33(1)(h) length of 30.1 m or more, $16.80 single trip
Front overhang over 0 mover about 0 ft — The charge is for a projection "of any length", so the band has no lower bound of its own and fires on any front overhang the caller reports. CA$8.40 s. 33(1)(e) a projection of any length from the front of the vehicle, $8.40 single trip

When more than one band fires: The source lists several charges for one permit and never says how they combine.

Overweight fees

3. Manitoba overweight permit fees

The overweight product here is the Overweight permit, non-annual (HTA s. 87) (single-trip).

Priced by the kilometre

s. 32(2): the greater of (a) $0.050 per km from the point of departure to the destination specified in the permit, multiplied by each increment of 1,000 kg or part of one by which the permit allows the vehicle to exceed the permissible axle weight on each of its axle units, or (b) $8.40

The source states a floor of CA$8.40, which is a floor and not a total.

Several provinces price an overweight permit by the kilometres travelled INSIDE that province. We do not measure per-province kilometres — that needs a Canadian road network and provincial boundary polygons (Statistics Canada / the National Road Network), which this engine does not hold — so the fee is left unpriced rather than computed from the lane total, which would be a different and smaller number.

How the oversize and overweight charges relate on one move: These are different permits — the move needs both, each priced on its own.

Term products

4. Term and annual products

Products this province issues that we record and do not price4 products

Each of these is a real, published product. It is recorded and left unpriced because choosing between a trip permit and a twelve-month permit is a question about what is being bought, not a data gap — and answering it unasked would quote a year of permits for one move.

Each line below quotes the regulation in its own words, so the dollar signs are the regulation's. They are Canadian dollars, like every other figure on this page.

  • Annual overdimensional permits: $28 / $63 / $133 / $273 by the same width bands, $28 for a front projection, $28 / $112 / $224 by the same length bands (s. 33(1)).
  • Annual overweight permit: $105 for each 1,000 kg increment over the permissible axle weight on each axle unit (s. 32(3)), with s. 32(4) deciding which highway’s limit applies. Flat in distance, so priceable from axle-unit detail the quote does not yet collect.
  • s. 33(1)(i): $28 for any other permit for a vehicle not complying with the Act.
  • s. 33(2): no charge for an overdimensional permit for a truck registered as a farm truck — a sourced zero, not an absent fee.
Other issuers

5. Who else issues a permit here

Part of the network here is permitted by somebody else. A provincial total can be complete and still be missing a whole permit.

  • s. 34: where the City of Winnipeg or the City of Brandon is the traffic authority of a highway, the charge is the fee that city has prescribed by by-law. We hold no by-law, so a Winnipeg or Brandon segment is unpriced.
Currency

6. These figures are Canadian dollars

Canadian permit fees are stated in CANADIAN DOLLARS by every source they come from, and this quote does not convert currency — there is no exchange-rate source on the answer path. A CAD permit fee is therefore shown on its own line in CAD and is NOT included in any US-dollar subtotal.

Provenance

7. Every source behind this page (1)

Every document behind Manitoba1 source
Common questions

Questions

How much is an oversize permit in Manitoba?

Manitoba prices its oversize permit across 8 published dimensional bands rather than at one flat figure — every band and its published wording is in the fee section above, in Canadian dollars.

Does Manitoba price an overweight permit by distance?

Yes — and that is why we do not put a number on it. Several provinces price an overweight permit by the kilometres travelled INSIDE that province. We do not measure per-province kilometres — that needs a Canadian road network and provincial boundary polygons (Statistics Canada / the National Road Network), which this engine does not hold — so the fee is left unpriced rather than computed from the lane total, which would be a different and smaller number.

Are these Manitoba fees in US dollars?

Canadian permit fees are stated in CANADIAN DOLLARS by every source they come from, and this quote does not convert currency — there is no exchange-rate source on the answer path. A CAD permit fee is therefore shown on its own line in CAD and is NOT included in any US-dollar subtotal.

↑ Back to the contents